Prior survey
Technical site visit, measurement and scaffold design tailored to the job before any material is moved.
Installing an industrial scaffold leaves no room for improvisation. Our team applies ISO 45001, site-specific risk prevention plans and full documentary control: prior survey, supervised assembly, structural certificate and periodic inspections.
Technical site visit, measurement and scaffold design tailored to the job before any material is moved.
Every installation has a responsible person validating critical points: anchors, platforms, staircases and guardrails.
Full documentation for your site: structural certificate, assembly, use and dismantling plan (PMUD) and periodic (weekly) inspection.
If safety and documentation are non-negotiable — and they should be — Plainsa is the right choice. Over 25 years installing scaffolding at industrial plants and public works across Catalonia.